Blog
Field notes: the lot that looked quiet until the duty proxy caught itA dealer lot with eight units and no visible churn kept getting skipped on the call list, until the duty proxy read the site differently.
What a parts spend proxy is, and why it beats age alone for call priorityMachine age tells you a unit is old. A parts spend proxy tells you which old units are working hard enough to need the call.
Two fleets, same score: how to break a tie in your call listWhen two fleets land on the same score in your territory list, skip the drive-time default. Here's how to break the tie using age, duty, and trend.
What counts as a trending fleet in a quarterly rebuild scoreHow the trend component in a quarterly rebuild score gets built, and what separates a rising fleet from a falling one on your call list.
Field notes: the county line that cut a fleet's score in halfA fleet split across a county line looked like two mediocre accounts to two reps instead of one hot rebuild lead to either.
How to split a territory call list between two field techs without duplicate visitsA map split causes duplicate visits because it ignores which fleets are due for work. Split the ranked call list instead, not the territory.
Turning a ranked machine list into a weekly tech routeA planner's walkthrough for converting a ranked machine list into a weekly call route for field techs, without losing the priority order.
quarterly satellite scoring vs. telematics subscriptions for ranking a service territoryA look at what telematics subscriptions cover and don't, and where a quarterly satellite pass fills the gap when ranking fleets for service calls.
Estimated machine age vs. build-year records: which one should drive your call listBuild-year records show when a machine left the factory. They don't show how hard it's worked. Here's what to trust when you're timing outreach.
Field notes: the fleet that scored high three quarters running and still didn't callA high-scoring fleet got skipped three quarters straight. What that says about reading score components instead of just the rank.
How to rank fleets by rebuild likelihood across a territoryA method for building a territory call list ranked by rebuild likelihood instead of drive time, using fleet age and duty signals.
What is a rebuild curve in heavy equipment fleet planning?A rebuild curve maps fleet age to component wear by machine class, distinct from estimated age. Here's the difference and why it matters for call priority.
Duty cycle vs duty proxy: what site intensity tells you that an hour meter can'tDuty cycle reads one machine's hour meter. A duty proxy reads how hard the whole site is working, catching wear trends hours alone miss.
How to spot a fleet nearing rebuild before the warranty claim shows upA warranty claim is the last signal a fleet sends, months after the real one. Here's what moves first, and how to read it before the call comes in.
Duty cycle vs. hour meter: which one actually predicts a rebuild?Hour meters track engine run time only. Duty cycle, read from site intensity, is the stronger signal for when a machine is due for a rebuild.
How to estimate machine age without a serial number lookupNo serial number on a machine in your territory? Here's how techs estimate age and duty from wear, design cues, and site intensity.
What counts as a major component failure in an OEM service contractHow OEM service contracts define major component failure, which systems usually qualify, and why the definition shapes your rebuild and parts forecast.
What is remaining useful life in heavy equipment maintenance?What RUL means for heavy equipment, how it's calculated from hours, condition data and duty cycle, and why it drives service call priority.